A 2027 merch planning calendar starts with the date the hats need to be in people's hands, then works backwards through custom hat lead times. Classic, Expedited, and Blank do not share a single timeline, and a brief that arrives six weeks before the event is already late for a fully custom run.
December is when many merch and procurement teams date the first half of the coming year: a March offsite, a June conference, a September campaign launch. A brief that arrives with a date, a quantity, and a realistic program choice is almost always recoverable.
This calendar uses the three programs we offer (Classic, Expedited, and Blank) and the constraints that actually move a date: sampling, order complexity, and how the hats are shipped.
The three programs, and how long each takes
We offer three ways to order, and they do not share a single timeline.
Classic is our signature program: fully customised hats made from upcycled and recycled materials, hand-assembled by the artisan team at our supplier in Cigondewah. Because each hat is made to order, this is the longest route. Our most recent published planning figure is 60 to 90 days from order confirmation to delivery.
Expedited is built for teams under time pressure. We keep a stock of pre-made hat bases in core styles and materials, and your branding goes onto a hat that is already partly complete. Quality and materials stay the same; flexibility on customisation is tighter. The most recent published figure is typically two to four weeks.
Blank is unbranded, undecorated Topiku hats, ready to ship. If you have your own embroidery or printing partner, or you want hats without decoration, blanks can ship within days of the order.
Custom Hats by Topiku
Working backwards from the date you need the hats
Treat the delivery date as fixed, and count back the full Classic window first. If that date still works, Classic is open. If it does not, Expedited or Blank may be the honest fit, rather than promising a custom timeline the process cannot meet.
Using 60 to 90 days for Classic and two to four weeks for Expedited: hats needed at the end of March 2027 should be confirmed in January, with the conversation starting in December. Sample rounds and sea freight, if you choose it, must sit inside that window, not after it. For the end of April, start the conversation in January and aim to confirm in February. For June, start in March, and earlier if the brief is complex. For a September campaign, a Classic confirmation in June or July leaves room for sampling; waiting until August generally means Expedited or Blank.
None of these dates include a long revision cycle. If the first sample needs a change, that time comes out of the same window.
What else belongs in the timeline
Order complexity is one of the biggest variables. A single colour, a single style, and a simple embroidery design is a straightforward run. Multiple colourways, special materials, woven labels, or unusual decoration add time at every stage.
Approvals and revisions also take time that briefs often omit. We produce a digital mock-up for approval before any physical sample begins. Where colour accuracy or construction detail is critical, a physical sample follows. Full production starts only after sign-off. We do not skip the sample stage to protect a date. The sample exists to catch a problem when it costs one hat to fix, not two hundred.
A complete brief shortens this cycle: a Pantone code, a vector logo file (AI, EPS, or SVG), a quantity that matches real need, and the date the hats are needed. Our guide to writing that brief is already on the blog. Start at topiku.co/custom-hats; the team follows up by email to confirm the order and a realistic timeline.
Sea freight versus air freight
Shipping is not a last-minute add-on. It belongs in the plan because, for us, it is also an impact decision.
On our impact page we note a fact that surprises many apparel buyers: most of our carbon footprint comes from distribution. In standard apparel manufacturing, typically 98 percent of greenhouse gas emissions occur in the stages before distribution. Our situation is different, which is why we prioritise sea freight wherever the timeline allows. Sea freight takes longer than air. It is also the lower-emissions option, and usually the lower-cost one.
If the date only works with air freight, we can accommodate that, but it needs to be said at the briefing stage, not after production is already under way. Choosing sea freight is one of the few ways a buyer can reduce the footprint of an order after the hat itself has been specified.
Minimums, mock-ups, and samples
A few constraints are worth knowing before the brief is written.
We offer fully customisable orders starting at 30 pieces. That minimum exists so that teams can order what they will use, rather than inflating a run to hit a factory threshold.
Every inquiry can begin with a free digital mock-up of the design. We can also send a sample of our best-selling hats, available to ship anywhere in the world. Neither is a delay if it is built into the plan; both become delays only when they are treated as surprises.
The short version
Start with the date. Count back 60 to 90 days for a fully custom Classic order, two to four weeks for Expedited, and days for Blanks. Leave room for a digital mock-up, a physical sample where it matters, and sea freight if you want the lower-impact route. Have a Pantone code, a vector file, a quantity, and a date ready before you start.
If you are planning merch for 2027, the conversation can start now, even with a rough idea. Request the custom order guide at topiku.co/custom-hats and the team will follow up from there.
Works Cited
1. Topiku. Understanding Lead Times, Speed, and Better Planning at Topiku. https://www.topiku.co/blog/understanding-lead-times-speed-and-better-planning-at-topiku
2. Topiku. Choosing the Right Sustainable Hat: Expedited vs Classic vs Blank. https://www.topiku.co/blog/choosing-the-right-hat
3. Topiku. How to Write a Custom Hat Brief Your Manufacturer Can Use. https://www.topiku.co/blog/how-to-write-a-custom-hat
4. Topiku. Custom Hats. https://www.topiku.co/custom-hats
5. Topiku. Beyond Hats: Topiku’s Social & Environmental Impact. https://www.topiku.co/impact
6. Topiku. What Topiku's 2025 Numbers Actually Mean for the Planet. https://www.topiku.co/blog/what-topikus-2025-numbers-are